slovodefinícia
demurrage
(encz)
demurrage,náhrada za prodlení Zdeněk Brož
demurrage
(encz)
demurrage,zdržné Zdeněk Brož
Demurrage
(gcide)
Demurrage \De*mur"rage\, n. [Cf. OF. demorage delay. See
Demur.] (Law)
(a) The detention of a vessel by the freighter beyond the
time allowed in her charter party for loading, unloading,
or sailing.
(b) The allowance made to the master or owner of the ship for
such delay or detention.
[1913 Webster]

The claim for demurrage ceases as soon as the ship
is cleared out and ready for sailing. --M`Culloch.
[1913 Webster]

Note: The term is also applied to similar delays and
allowances in land carriage, by wagons, railroads, etc.
[1913 Webster]
demurrage
(wn)
demurrage
n 1: a charge required as compensation for the delay of a ship
or freight car or other cargo beyond its scheduled time of
departure
2: detention of a ship or freight car or other cargo beyond its
scheduled time of departure
DEMURRAGE
(bouvier)
DEMURRAGE, mar. law. The freighter of a ship is bound not to detain it,
beyond the stipulated or usual time, to load, or to deliver the cargo, or to
sail. The extra days beyond the lay days (being the days allowed to load and
unload the cargo), are called the days of demurrage; and that term is
likewise applied to the payment for such delay, and it may become due,
either by the ship's detention, for the purpose of loading or unloading the
cargo, either before, or during, or after the voyage, or in waiting for
convoy. 3 Kent, Com. 159; 2 Marsh, 721; Abbott on Ship. 192 5 Com. Dig. 94,
n., 505; 4 Taunt. 54, 55; 3 Chit. Com. Law, 426; Harr. Dig. Ship and
Shipping, VII.

podobné slovodefinícia
demurrage
(encz)
demurrage,náhrada za prodlení Zdeněk Broždemurrage,zdržné Zdeněk Brož
demurrage
(wn)
demurrage
n 1: a charge required as compensation for the delay of a ship
or freight car or other cargo beyond its scheduled time of
departure
2: detention of a ship or freight car or other cargo beyond its
scheduled time of departure
DEMURRAGE
(bouvier)
DEMURRAGE, mar. law. The freighter of a ship is bound not to detain it,
beyond the stipulated or usual time, to load, or to deliver the cargo, or to
sail. The extra days beyond the lay days (being the days allowed to load and
unload the cargo), are called the days of demurrage; and that term is
likewise applied to the payment for such delay, and it may become due,
either by the ship's detention, for the purpose of loading or unloading the
cargo, either before, or during, or after the voyage, or in waiting for
convoy. 3 Kent, Com. 159; 2 Marsh, 721; Abbott on Ship. 192 5 Com. Dig. 94,
n., 505; 4 Taunt. 54, 55; 3 Chit. Com. Law, 426; Harr. Dig. Ship and
Shipping, VII.

Nenašli ste slovo čo ste hľadali ? Doplňte ho do slovníka.

na vytvorenie tejto webstránky bol pužitý dictd server s dátami z sk-spell.sk.cx a z iných voľne dostupných dictd databáz. Ak máte klienta na dictd protokol (napríklad kdict), použite zdroj slovnik.iz.sk a port 2628.

online slovník, sk-spell - slovníkové dáta, IZ Bratislava, Malé Karpaty - turistika, Michal Páleník, správy, údaje o okresoch V4