podobné slovo | definícia |
financing requirements (encz) | financing requirements, |
minimum reserve requirements (encz) | minimum reserve requirements,povinné minimální bankovní rezervy Mgr.
Dita Gálová |
requirements contract (encz) | requirements contract, n: |
to meet requirements (encz) | to meet requirements,vyhovět požadavkům Mgr. Dita Gálová |
requirements contract (wn) | requirements contract
n 1: a contract in which you agree to purchase all your
requirements of a particular sort from one party |
dynamic object-oriented requirements system (foldoc) | Dynamic Object-Oriented Requirements System
(DOORS) A tool from {Quality
Systems & Software Ltd.} for handling all kinds of
requirements (in fact, any information at all) as modules
containing trees of text objects, qualified by an arbitrary
number of user-defined attributes, and cross-linked by
directional links.
|
functional requirements (foldoc) | functional requirements
What a system should be able to do, the
functions it should perform.
This term is used at both the user requirements analysis and
software requirements specifications phases in the {software
life-cycle}.
An example of a non-functional requirement is an
initialisation sequence incorporated into the software that is
specific to a given customer.
(2001-05-22)
|
material requirements planning (foldoc) | Material Requirements Planning
MRP
(MRP) A system for effectively managing material
requirements in a manufacturing process.
Information systems have long been an important part of the
manufacturing environment. In the 1960s, manufacturers
developed Material Requirements Planning (MRP). According to
the American Production and Inventory Control Society,
Inc. (APICS), MRP is a set of techniques that uses bill of
material data, inventory data, and the master production
schedule to calculate requirements for materials. It makes
recommendations to reorder materials. Furthermore, because it
is time-phased, it makes recommendations to reschedule open
orders when due dates and need dates are not in phase.
Time-phased MRP begins with the items listed on the Master
Production Schedule and determines the quantity of all
components and materials required to fabricate those items and
the date that the components and material are required.
Time-phased MRP is accomplished by exploding the bill of
material, adjusting for inventory quantities on hand or on
order and offsetting the net requirements by the appropriate
lead times.
See also Manufacturer Resource Planning.
(1999-02-16)
|
operational requirements (foldoc) | operational requirements
Qualitative and quantitative parameters that
specify the desired capabilities of a system and serve as a
basis for determining the operational effectiveness and
suitability of a system prior to deployment.
(1997-01-07)
|
requirements acquisition and controlled evolution (foldoc) | Requirements Acquisition and Controlled Evolution
(RACE) A "back to basics" approach to
requirements engineering. The method, is being pieced
together through a series of intermediate research studies.
In essence, the approach has been to establish requirements
for RACE, identify individual techniques that meet those
requirements, experiment with the combined use of the
techniques, and finally assemble the method. In practice,
RACE has been influenced significantly by Checkland and
Wilson's Soft Systems Methodology (SSM) and this forms the
core of the method.
(1995-11-21)
|
requirements analysis (foldoc) | requirements analysis
The process of reviewing a business's processes to
determine the business needs and functional requirements
that a system must meet.
(1996-08-01)
|
requirements engineering (foldoc) | Requirements Engineering
The task of capturing, structuring, and
accurately representing the user's requirements so that they
can be correctly embodied in systems which meet those
requirements (i.e. are of good quality).
DOORS is one product to help with this task.
(1995-11-11)
|